Power & Energy decision intelligence

Optimise the full cost of serving power.

Connect demand forecasts, market bids, generation, fuel sourcing, blending, logistics and ash economics in one decision architecture — and see the trade-offs before the operating day makes them expensive.

The decisions behind the cost of serving power Coal sourcing feeds rail and road logistics, which feed coal stock and blending, which feeds own generation. Own generation produces ash. The demand forecast, net of contracts, and own generation meet at the power position — the cost and risk of serving demand — which is balanced against day-ahead and real-time market buying and selling. FUEL SIDE Coal sourcinggrade · contract · ₹/GCal Rail & road logisticsrakes · ETA · demurrage Stock & blendingGCV · ash · moisture Own generationavailability · heat rate Ashstorage · offtake · trucks DEMAND SIDE Demand forecast96 blocks · net of contracts Power positioncost + risk ofserving demand MARKET SIDE MarketDAM · RTM · surplus Generate or buy, block by block — with fuel, units and corridor in view.
  1. Fuel side Coal sourcing → rail & road logistics → stock & blending → own generation → ash
  2. Demand side 96-block demand forecast, net of contracts
  3. Power position cost + risk of serving demand, block by block
  4. Market side day-ahead and real-time buying, surplus and export
  • Live

    96 blocks a day

    Fifteen-minute day-ahead load forecasts, delivered daily to an Indian power utility.

  • Live

    96.8%

    Average block-level forecast accuracy across counted live days.

  • Shadow-tested

    Seconds

    To build a constraint-aware day-ahead bid pack — a job that takes the desk 45–60 minutes by hand.

One operating day

Follow a forecast into a decision.

Ninety-six blocks of demand, three ways to meet them, one corridor to the market. Change what happens tomorrow and watch the position, the bid pack and the recommendation move together.

Tomorrow's power position Synthetic utility · 96 × 15-min blocks · import corridor 550 MW
Illustrative example · synthetic data

How to read this example
Market requirement · proposed bids
Energy the plan asks the day-ahead market for, within the corridor. A request, not cleared energy.
Unbid residual
Small pieces of the requirement (under 5 MW) that the bid pack leaves out. A packing remainder, not a supply gap.
Uncovered energy
Demand that available units and the import corridor cannot meet day-ahead. A physical gap to cover in the real-time market or a contingency plan — not assumed to clear anywhere.
Illustrative expected cost
Variable generation plus market purchases at assumed prices. Not a settled or realised cost.

The same forecast feeds how much to buy, which units to run and what the fuel plan has to deliver. Optimised separately, each desk can be right and the utility still pays too much. Optimised together, the trade-offs are visible while there is still time to act on them.

Coal to power to ash

One connected architecture for decisions that usually sit on separate desks.

Every one of these choices changes the cost of the others. UpSynQ is designed to optimise them as one system — usable energy, not tonnes; the whole day, not one block.

Fuel

01

Which coal mix gives the lowest delivered energy cost?

Sourcing, contracts and grade choice on landed cost per usable GCal — not price per tonne.

02

Will the rakes arrive in time — and at what cost?

Mine or port to siding to plant: ETA, handling capacity, freight and demurrage.

03

What should we blend and burn this week?

Lot inventory, GCV, ash and moisture, within boiler and plant limits.

Generation & position

04

Which units are ready, and how hard can we run them?

Availability, heat rate, ramp and minimum load, fuel cover per plant.

05

What should we generate versus buy tomorrow?

The 96-block forecast, net of contracts, against own units, back-down and market prices.

Market & by-products

06

Where is the risk of being short — or carrying surplus?

Day-ahead and real-time bids, surplus and export, corridor limits and settlement exposure.

07

What is the best offtake and truck plan for ash?

Ash forecast from the burn plan, buyers, storage, dispatch and compliance — at the best net realisation.

In operation

From the system control desk of an Indian power utility.

Operator
Indian power utility · anonymised
Desk
System control and power procurement
Resolution
96 fifteen-minute blocks, day-ahead

Live Day-ahead load forecasting

Every day, a forecast for all 96 blocks of the next day is delivered to the desk through a working forecast portal, versioned so every number can be traced back to the run that produced it. Accuracy is tracked block by block and by time of day — where the evening transition and the day boundary are hardest.

96.8% average block-level accuracy across counted live days

Shadow-tested Day-ahead bid construction

A constraint-aware engine turns the forecast's net requirement into a feasible pack of block and single bids within the desk's bid-count and corridor rules — in seconds rather than the 45–60 minutes it takes by hand. It has been run against historical days; live trading trials are the next step.

Seconds to a feasible bid pack

Why connect them

A fresher forecast changes the net power need; the net need changes the bid; the bid's cost depends on what the units can do — and the units on what the fuel plan delivers. Forecasting and bidding are where the chain starts. The same architecture runs upstream to coal and downstream to ash.

One platform

Same foundation as planning. Different physics.

Power runs on the platform behind integrated business planning. The building blocks are shared; the objectives, timing and constraints are the utility's own.

Shared foundationIn planningIn power
Data preparationERP extracts, planning files, mastersMeter and SCADA history, schedules, weather
Forecasting & evaluationMonthly SKU × location, sealed holdouts96 blocks a day, accuracy by time of day
ConstraintsMOQ, batches, lines, shelf life, approvalsCorridors, bid rules, unit limits, fuel quality
Optimisation & simulationFeasible plan at lowest cost within policyGenerate vs buy at lowest cost and risk
Decision & reviewStaged approval, frozen versionsMaker-checker on the desk, plan vs actual

Explore the platform

Talk to UpSynQ

The power position changes. Your decisions should change with it.

Bring one decision — tomorrow's procurement, a unit outage, a coal blend, an ash contract — and we'll show what it looks like with forecasts, constraints and costs in one place.